4.3. Calculated data

4.3.1. Tote controls

As you have seen earlier, the Tote performs a number of calculations while you are stepping through a plot. Of the two symbols at the foot of each secondary column in the Tote, the first one is the "remove" button, which removes that track from the Tote.

Figure 4-1. The controls on the Tote

There is no need to remove the primary track from the Tote, just make another track the primary track by right-clicking on it in the plot.

4.3.2. Comma-separated Variables

The second symbol is the "copy" symbol which copies the current column of data to the clipboard in a comma-separated-variable text format.

4.3.3. Microsoft Excel

This information can be pasted directly into a spreadsheet such as Microsoft Excel.

Alternatively, Debrief can output a whole series of calculated data for each track in the Tote. To do this, you must enter the Track & Time Toolbox panel by clicking the right-most button on the second row of buttons shown above:

4.3.4. Copying data to clipboard

The Copy data to clipboard operation within the Track & Time Toolbox performs calculations between a number of tracks, outputting the data to the clipboard in tab-separated variable format. This textual data is ideally formatted for further analysis in Excel.

A header line is written first, which indicates the contents of each column:

Track Time(hhmmss)
Depth(metres)
Speed(Knots)
Course(degs)
Range(yards)
Bearing(degs)
Brg Rate(deg/min)
Name
PrimaryName

The results from the primary track are listed first, which (as in the Tote) do not show results of calculated operations:

CARPET 12/Dec/95 05:00:00 000 02.00 269.7 n/a n/a n/a n/a 0500 0500

Lastly the secondary tracks are listed:


 BUNKUM 12/Dec/95 05:50:00 000 00.00 000.0 12381 311.0 R49.0 R0.264 F5 0550

Important

The last two columns output give identifier information: the first of these is the name of the current item in this track, and the second is the point in the primary track nearest to the current time stamp: that-is the point in the primary track which has been used for the calculated results.